The Cullen Hotel

Asian Pacific
$682,000

Installation of a Fire Sprinkler, Fire Detection and Hydrant/Hose Reel systems. The Cullen Hotel project started on October 2008 and was completed at the early 2010.

We have used our own employees for all disciplines which include sprinklers, electrical and hydrants. On this project the consultant originally showed a fire pump to be installed, however we were able to redesign the system without using a pump, which saved money for our client.